HostOSWe help your hotel show up in AI answers.Book your free auditMenu

Travel trends · Rajasthan · Udaipur

Udaipur Airport's New Terminal and International Flights: What Changes for Udaipur Tourism

Udaipur’s airport is getting a much bigger terminal, and there’s talk of international flights. For a hotel owner, the useful question is what’s actually confirmed, what’s only expected, and what you should do about it. This guide sets out the status as of 7 October 2026, with a source for every point. We’ll update it when anything changes. We rechecked on 19 October 2026 and found no announcement that changes it.

What has been built at Udaipur airport, and what’s confirmed?

A new integrated terminal is being built at Maharana Pratap Airport (often called Dabok airport), and as of 7 October 2026 it is not open. In March 2026 the civil aviation minister, K. Rammohan Naidu, told the Rajya Sabha that the terminal was under construction and would be inaugurated in 2026.[1] A government project-monitoring report covered in June 2026 put completion at September 2026,[2] and after a site inspection in July 2026 the local MP said it would be complete by September.[3] That target has now passed. Our understanding from Udaipur is that opening is expected in late 2026 or in 2027; no official date has been announced.

Item Status as of 7 October 2026 Source
Foundation stone Laid by the Prime Minister on 5 October 2023 Organiser with ANI, 6 Oct 2023[4]
Completion target September 2026 MoSPI report via Udaipur Times, 2 Jun 2026[2]; MP’s inspection, 13 Jul 2026[3]
Terminal opening Not open. Expected late 2026 or 2027; no official date Local information, October 2026
Project cost About ₹887 crore, as reported in 2025 and 2026 Udaipur Times[2]; Patrika[5]
Size and capacity Reports differ (see below) Organiser[4]; Patrika[5]
International routes None announced. The minister said talks with airlines were under way PTI, 30 Mar 2026[1]
Immigration post Udaipur is not on the list of designated immigration posts notified on 1 September 2025 MHA notification S.O. 3987(E)[6]

On size and capacity, reports differ. Coverage of the 2023 foundation stone described a terminal of about 60,000 square metres serving 4,000 passengers at peak hours and 50 lakh passengers a year.[4] A September 2025 report described about 43,000 square metres, capacity for 2,050 passengers at a time (against 680 in the current terminal), and car parking rising from 300 to 700 spaces.[5] Cost figures have varied too: the 2023 report gave a lower number than the ₹887 crore reported since. We haven’t found final figures published by the Airports Authority of India, so treat all of these as reported, not confirmed.

For context, Jodhpur’s new terminal, whose foundation stone was laid the same day as Udaipur’s, was inaugurated by the Prime Minister on 4 July 2026.[12]

How busy is Udaipur airport today?

Udaipur airport handled 18,19,531 passengers in 2025-26 (April 2025 to March 2026), up 10.2% from 16,50,607 the year before, according to the Airports Authority of India.[10]

2024-25 2025-26 Change
Domestic passengers 16,50,314 18,19,041 +10.2%
International passengers 293 490 +67.2%
All passengers 16,50,607 18,19,531 +10.2%

Source: AAI Traffic News, March 2026, Annexure III.[10]

Two things stand out. First, almost every passenger is domestic: AAI lists Udaipur among its domestic airports, and the few hundred international passengers came from occasional international movements, not scheduled routes.[10] Second, the airport is already growing without international flights. Any international routes would add to a domestic base that’s rising on its own.

What would international flights from Udaipur need?

Regular international flights need three things in place: immigration, customs, and an airline willing to fly the route.

  1. An immigration post. Under the Immigration and Foreigners Act, 2025, the central government notifies “designated immigration posts” for entry into and exit from India, staffed by immigration officers.[7] Every foreigner arriving must show their passport and visa at the immigration post.[8] The list notified on 1 September 2025 named 37 airports, including Jaipur but not Udaipur.[6] In practice, Udaipur would need to be added before scheduled international flights.
  2. Customs. The Central Board of Indirect Taxes and Customs appoints customs airports by notification under section 7 of the Customs Act, 1962.[9] Passengers and their baggage need customs clearance on arrival, so this has to be arranged as well.
  3. An airline and a route. Airlines choose routes where they expect enough paying passengers. Foreign airlines also depend on the air services agreement between India and their own country. This is the part nobody can schedule in advance.

In March 2024, Udaipur’s airport director was reported as saying customs and immigration procedures were in place, and that airlines were considering night flights to Gulf countries.[11] No such route has been announced in the two and a half years since, so treat that report as interest, not a plan.

How could international flights change Udaipur tourism?

This section is reasoning, not fact. Nothing below has happened yet. If direct international flights do start, here’s what we’d expect, based on how a direct route changes the journey for a traveller:

  • A different guest mix. Travellers from the connected city, and Indians living there, could reach Udaipur without changing planes in Delhi or Mumbai. Which countries matters a lot, and that’s unknown.
  • Longer stays, or extra nights. A shorter journey can leave more of a holiday for the destination itself. It can also make Udaipur the starting point of a Rajasthan trip rather than a stop in the middle.
  • Arrivals at unusual hours. International schedules are set around the other end of the route. Late-night and early-morning arrivals would mean late check-ins, airport pickups at odd hours and Form C filings at the end of a night shift.
  • Seasons that shift a little. Demand from abroad follows the source country’s holidays, which may not match Udaipur’s domestic peaks.
  • More competition for the same guests. International travellers often shortlist hotels on global OTAs, Google and AI tools. Hotels that are clear and consistent on all three are likelier to be shortlisted.

The size of any effect depends on the route, how often it runs and the fares. One or two weekly flights would change much less than a daily service.

What hasn’t changed yet?

As of 7 October 2026:

  • The new terminal isn’t open, and no official opening date has been set.
  • No international route, airline or start date has been announced.
  • Udaipur hasn’t been added to the list of designated immigration posts, as far as we can find.
  • International visitors still reach Udaipur through other airports, by road or by rail, as they do today.

If you see a claim that flights to a particular country are “starting soon”, check whether an airline has actually put tickets on sale. Until then, it’s a hope, not a schedule.

What this means for hotel owners

You don’t need to bet on international flights. The useful steps are ones that help with the foreign guests you already get, and they cost little:

  1. Watch for the three signals: the terminal opening, Udaipur being notified as an immigration post, and an airline announcing a route with dates. We’ll update this guide when any of them happens.
  2. Fix how foreign travellers find you. Your Google listing, OTA pages and website should say the same things in clear English: location, distance from the airport, room types, what’s included. Our guide to getting your Udaipur hotel recommended by AI tools covers this in detail.
  3. Make it possible to pay from abroad. If your payment gateway doesn’t accept international cards yet, find out what activation needs.
  4. Make Form C routine. If your staff file Form III (formerly Form C) within 24 hours every time today, more foreign guests won’t create a backlog. The Bureau of Immigration’s Form C portal has the registration steps and current guidance.
  5. Plan for late arrivals. Decide now who checks in a guest at 2 a.m. and how the airport pickup works.

Our preparation checklist for Udaipur hotels turns these into a 30, 60 and 90-day plan. For the wider picture of who visits and when, read Udaipur tourism trends and Rajasthan tourism trends. If a route is announced, our Performance Marketing service can help you reach travellers in the new source market quickly.

Key takeaways

  • As of 7 October 2026, Udaipur's new terminal was not open. The September 2026 target has passed, and opening is now expected in late 2026 or 2027.
  • No international routes, airlines or dates have been announced. The government says it is in talks with airlines.
  • Udaipur is not on the list of 37 airports notified as designated immigration posts in September 2025. Jaipur is.
  • Udaipur airport handled 18.19 lakh passengers in 2025-26, up 10.2% on the year before, almost all of them domestic.
  • Hotels can prepare now at little cost. Better listings, international payments and a Form C routine also help with the foreign guests you already get.

Frequently asked questions

Is Udaipur airport international now?

Not for regular international flights. As of 7 October 2026, no international routes have been announced, and Udaipur isn't on the list of designated immigration posts notified in September 2025. The Airports Authority of India lists it among its domestic airports, although it recorded 490 international passengers in 2025-26 from occasional international movements.

When will international flights start from Udaipur?

No date has been announced. In March 2026 the civil aviation minister told the Rajya Sabha that the new terminal would be inaugurated in 2026 and that talks with airlines were under way. Watch for three signals: the terminal opening (now expected in late 2026 or 2027), Udaipur being notified as an immigration post, and an airline putting a route on sale.

Which countries could Udaipur connect to?

None have been announced. A local report in March 2024 said airlines were considering night flights to Gulf countries, but no airline has confirmed a route since. Treat any destination you hear about as speculation until an airline puts tickets on sale.

How will this affect Udaipur hotels?

Nothing changes until routes are announced. If direct international flights do start, we'd expect more foreign and NRI guests arriving without a stop in Delhi or Mumbai, more late arrivals, and more bookings through global OTAs and AI tools. Hotels that are easy to find and book in English, take international payments and handle Form C well will be ready.

Sources

  1. New terminal building at Udaipur airport to complete soon; efforts on for overseas flights: Naidu (PTI), ETV Bharat, 30 March 2026. Accessed 7 October 2026.
  2. Udaipur Airport: New Terminal Expected to be Completed by September 2026, Udaipur Times, 2 June 2026. Accessed 7 October 2026.
  3. Mewar getting ready for international flights: Udaipur airport's new terminal to be completed by September (Hindi), Khas Khabar, 13 July 2026. Accessed 7 October 2026.
  4. PM Modi lays foundation stone for new terminal buildings in Udaipur and Jodhpur Airport, Organiser (with inputs from ANI), 6 October 2023. Accessed 7 October 2026.
  5. Udaipur Airport's New Terminal to Open Six Months Ahead of Schedule, Patrika, 18 September 2025. Accessed 7 October 2026.
  6. Notification S.O. 3987(E): designated immigration posts, 1 September 2025, Ministry of Home Affairs. Accessed 7 October 2026.
  7. The Immigration and Foreigners Act, 2025, section 4, Ministry of Home Affairs. Accessed 7 October 2026.
  8. The Immigration and Foreigners Rules, 2025, rule 11, Ministry of Home Affairs. Accessed 7 October 2026.
  9. The Customs Act, 1962, section 7, India Code, Legislative Department. Accessed 7 October 2026.
  10. Traffic News, March 2026, Annexure III: passengers, Airports Authority of India. Accessed 7 October 2026.
  11. Udaipur Airport to Introduce 24-Hour Operations and Gulf Flights, Udaipur Times, 16 March 2024. Accessed 7 October 2026.
  12. Jodhpur Airport's New Terminal Inaugurated by PM Narendra Modi, ANI, 4 July 2026. Accessed 7 October 2026.
Book your free AI visibility audit